Skip to main content
background

EPOLIS X9

Two-component epoxy-bitumen waterproofing

Application:

  • Protection of concrete structures and steel elements in industry and construction exposed to aggressive environments classified in exposure classes XA1, XA2 and XA3
  • Protection of ballast and sewage tanks in e.g. municipal or industrial sewage treatment plants
  • Protection of concrete structures in inland and marine hydraulic engineering projects
  • Priming of steel and concrete structures operated in sea water, sweet water, industrial-grade water and corrosive environment

Properties:

  • Provides high adhesion to the substrate
  • Forms a coating resistant to mechanical loads (abrasion, impact)
  • Resistant to sewage, acidic or alkaline substances, water, and both marine and industrial atmospheres
  • Free of coal tar, biutimnous substances with benzopyrene or aromatic amine hardeners

Available packaging:

  • 20 kg

Composition

  • component A - bitumen, epoxy resin, white spirit, filler, additives
  • component B - hardener

Density

1,1 g/cm³

Colour

black

Mixing ratio 

100 : 14 by weight (component A : component B) 

Number of layers

2

Recommended coating thickness

300 μm

Open time

1 h

Drying time

approx. 6 h

Time interval between applying following layers

approx. 24 h

Coating resistance to pulling off from the substrate, by a single blade device

not more than 0 degree

Full curing time

7 days

Resistance to rain

after approx. 6 h

Workability
- allowable increase in viscosity at this time

at least 1 hour
no more than 100 % 

Sag

at least 10 degree

Coating drying time at temperature (20 ± 2) °C and relative air humidity (55 ± 5) %

- grade 1 - no more than 4 h 
- grade 3 - no more than 8 h 
- grade 6 - no more than 24 h

Coat resistance in 144 h salt water test
- uniform damage to the coat is acceptable


not more than class 3

Coat resistance in 144 h salt spray test
- uniform damage to the coat is acceptable


not more than class 3

Durability

at least 6 months from the production date

Flash point

no less than 21°C

Application temperature

from +5°C to +30°C

Reference document(s)

PN-C-81916:2001
  • The temperature of the substrate and air during the works should be from +5°C to +30°C. The temperature of the substrate must always be at least 3°C above the dew point temperature until the material is fully cured. Works should not be carried out during precipitation and strong sunlight.

  • approx. 0,3 kg/m² - priming
  • approx. 0,6 kg/m² - top layer application 

Documents for download

icon National Declaration of Performance

icon Safety Data Sheet component A

icon Safety Data Sheet component B

icon Technical Data Sheet

Search for a document

Archival documents

Type of document
Year
Month